Due to the increased energy demand in the Hamburg district of Bergedorf, which is mainly caused by the electrification of the bus transport of VHH (Verkehrsbetriebe Hamburg-Holstein), the 10 kV switchgear at the Bergedorf substation of Stromnetz Hamburg has to be extended. The included renewal of the existing plant and the necessary expansion or conversion must be carried out during ongoing operation.
Delivery of a medium-voltage switchgear of type NXPLUS C including erection and commissioning. Furthermore, the order includes the renewal of the secondary technology in the existing medium-voltage switchgear, the station control technology, and the entire in-house requirements.
The expansion and renewal of the substation will make the electrical network of the city of Hamburg fit for the challenge of electromobility in the future.
Verwandte Beiträge
Kontakt
Kontaktieren Sie unseren Vertrieb für weitere Informationen und um direkt zu besprechen, wie unsere Produkte und Lösungen Ihnen helfen können, Ihr Problem am besten zu lösen.