Site expansion with a new
production building leads to an increase in energy requirements (electricity,
heat, cooling, steam and compressed air)
High demands on efficiency and
availability of energy and media supply
Goal: Efficient, sustainable and
reliable energy supply
Conception, planning and
construction of a new energy plant, including CHPs, heating and steam
boilers, refrigeration machines and air compressors, as well as plant
peripherals and piping connections.
Optimized operational management of
energy plant including visualization and control via Siemens building automation system Desigo.
Siemens takes over the operational
management of the energy plant as part of a full-service contract with
performance guarantee over 12 years.
Energy
cost savings: > €925,000 per year
Reduction
of CO2 emissions: > 2,400 t per year
Comprehensive
services and performance guarantee over 12 years
Integration
of subsidies in the amount of €1 million
Ferring GmbH, Kiel is specialized on the
production, freeze drying and
microencapsulation of pharmaceuticals.
The production site in Kiel is continuously
being modernized and expanded. In the
scope of the latest expansion, a new,
efficient energy center was built.
Verwandte Links
Bitte beachten Sie, dass einige der Links möglicherweise nur im Intranet verfügbar sind.
Kontakt
Kontaktieren Sie unseren Vertrieb für weitere Informationen und um direkt zu besprechen, wie unsere Produkte und Lösungen Ihnen helfen können, Ihr Problem am besten zu lösen.