This site uses cookies in order to improve your user experience and to provide content tailored specifically to your interests. Detailed information on the use of cookies on this website is provided in our Privacy Policy. You can also manage your preferences there. By using this website, you consent to the use of cookies.
Tři Chaloupky, Hydro-electrical power station, SIGENTICS HV
Retrofit of the old unecological production resources
Tři Chaloupky, Hydro-electrical power station, SIGENTICS HV
Retrofit of the old unecological production resources
Electrical & Electronic (E&E)
Tři Chaloupky, Hydro-electrical power station, Czech Republic
Making a nearly 70 year old hydro-electrical power station highly efficient and reliable.
Substituting the old unecological production resources.
SIGENTICS HV, HV Small Hydro generator with a capacity of 7.4 GW/year
“By substituting the old unecological production
resources, we have achieved an efficient and reliable production.“
Pavel Jindra, Owner of Hydropower Plant Tři Chaloupky, Czech Republic
This type of generator is very robust and highly efficient
Average lifetime of more than 30 years
Outstanding reliability and system availability even in harsh environments
Cooperation with Siemens since 2012, almost 6 years
Tři Chaloupky, in the town of Lysá nad Labem, located on the Elbe River in Central Bohemia.The Historical Hydro-electrical power station from 1948 uses a standard Kaplan water turbine with an average annual production of 7.4GW and an installed capacity of 2MVA
Tři Chaloupky, Hydro-electrical power station, Czech Republic