This site uses cookies in order to improve your user experience and to provide content tailored specifically to your interests. Detailed information on the use of cookies on this website is provided in our Privacy Policy. You can also manage your preferences there. By using this website, you consent to the use of cookies.
KTM AG, Engine Factory, Austria Higher Production Capacity Through Reduced Processing Time
KTM AG, Engine Factory, Austria Higher Production Capacity Through Reduced Processing Time
Automotive
KTM AG
Mattighofen Austria
Due to high demand, KTM had to quickly increase production capacity at minimal cost.
The implementation should carry very low risk and require no training for machine operators.
Real-time feedrate control
Based on real-time cutting data from the SINUMERIK control, the feedrate is optimized according to actual machining conditions using Optimize MyMachining /AdaptiveControl (OMM / AC).
After a successful Proof of Concept (PoC), OMM / AC is now in use on five machines, with plans for installation on additional machines.
The reduction in processing time by more than 10% was significant and resolved our capacity bottleneck.
Helmut Hansel, Head of Parts Manufacturing Operations, KTM AG
Reduced machining time by approximately 10% allowed to meet customer demand.
The shorter processing times reduced costs and energy per final part improving plant profitability.
KTM AG, with headquarter in Mattighofen Austria produces motorcycles on the highest level. The Engine Factory with around 96 people at Munderfingen site manufactures engine housings and cylinder heads.