“We were previously
experiencing 60 to 70 cycles, and are
now running with up to 100. The drives are braking much quicker and everything
which required more complex programming is now operating in isochronous mode.”
Jan Reimler, PLC Programmer, Helmerding hiw Maschinen GmbH
Increase of processing speed from 60 to 100 strokes/minute
Savings in time and costs with certified safety modules
Increase of parts production and availability
Helmerding hiw Maschinen GmbH situated in Bad Oeynhausen
High-speed systems with
continuous automation from the coiler to the press and remote I/O
Pilot
project transfer system: replacement of conventional PLC with SIMOTION D
250t
C-frame press KDH 200: Siemens complete solution, from the control through the
drive, to the respective technology objects