The savings achieved have far exceeded our expectations. Thanks to continuous optimization as part of the Energy Performance Contracting, annual savings have increased to 40 percent compared to the starting point, and at the same time, we have drastically reduced our emissions of CO₂.
Jürgen Breuer, Head of Engineering and Construction, Klinikum Bremerhaven-Reinkenheide