Availabilty due to requested transportation capacity (3000 people/hour)
Time to Market, Each project requires customization
Operation under harsh enviromental conditions
Safety Integrated
SIMATIC S7-1500; ET 200SP; SINAMICS S120/G120; SIRIUS ACT, TIA Portal
Intensive support by Siemens during planning and developement
Used Products:
Fail-safe CPUs
SINAMICS S120 built-in units
SINAMICS G120 built-in units
Industrial controls
"With safety systems from Siemens, we have a competent, reliable partner in safety technology, and we have a control solution that is tailored to our solution."
Günter Tschinkel, Head of Electrical Engineering Leitner ropeways
New possibilities to realize requested safety functions make the solution more flexible and therefor simpler
Increased availablity due to remote access and detailed remote diagnostis
Faster time to market, because the project could be split into several smaller, reuseable modules
The longest 3S gondola lift in the Alps and the world's first tricable gondola lift in two sections featuring non-stop operation.
The Eisgratbahn gondola lift represents a new generation of technology. Construction was completed in just 16 months and it is the perfect synthesis of innovative and modern technology.