“The schedule for the project was ambitious. The only way to keep the deadlines was with virtual commissioning.”
• Up to 30 % efficiency gains during software development• Efficient integration of the robot in the stacking unit despite complex motion sequences and a challenging space situation• Commissioning of the physical line with pre-tested and verified solutions saves time as well as material and labor costs