Siemens Logo
Siemens References
PG Duisburg, SINUMERIK in the Power Manufacturing Industry
Machinery and plant engineering, Germany

Machine Building

PG Duisburg

PG Duisburg
Duisburg,
Germany
  • Costs, delivery time and quality
  • High availability of the machines
  • Production in batch size 1
A single workpiece on a single machine may require up to 235 hours of machining time.
  • Automation of design tasks
  • Acceleration through automation of non-value-adding activities
  • Avoiding data disruptions
  • 70% savings in technical design from the middle of 2018
  • End-to-end digital process chain reduces throughput time from 9 to 6 months
  • Reduction of NCC
 
Strategic orientation of the entire production toward digitalization.
Related Links
Please note that some of the links may be only available in Intranet.
Contact
Contact our sales for more information and to discuss directly how our products and solutions could help you to best solve your problem.
Contact Sales
ID: 7206444EBA736260684F2D7EDB5A9C10