This site uses cookies in order to improve your user experience and to provide content tailored specifically to your interests. Detailed information on the use of cookies on this website is provided in our Privacy Policy. You can also manage your preferences there. By using this website, you consent to the use of cookies.
The
Wastewater Association Zirl
and the surrounding area counts 14 communities. The wastewater
treatment
plant has a capacity of 61,500 people equivanlents
(PE), the sewer network covers a total
length
of 50 km. The
following challenges were mastered in the project: - Complete
renewal of the EMSR plants in the sewage treatment plant and the sewer network - Migration
and implementation during full operation of plant
- Migration
of the existing control technology to WinCC OA (redundant) - Integration
of 21 outdoor facilities in parallel fiber optic and cellular - Renewal
/ programming of the controls from WAGO / ABB to SIMATIC S7-1500 - Installation
of 56 energy meters, service
and maintenance management with COMOS MRO
- Secure,
redundant data transmission - Hardware and software from a single source - Low
risk of data loss due to data buffering, central,
intuitive (remote) control and an individual software interface - Lower
susceptibility to failure with existing plant technology, identical
data base for operation and maintenance / servicing - Identical
data base for operation and maintenance / servicing
The
Wastewater Association Zirl
and the surrounding area counts 14 communities. The wastewater
treatment
plant has a capacity of 61,500 people equivanlents
(PE), the sewer network covers a total
length
of 50 km. The
following challenges were mastered in the project:
- Complete
renewal of the EMSR plants in the sewage treatment plant and the sewer network - Migration
and implementation during full operation of plant