SPP to generate 400 mln kWh annually powered by 35/150 kV substation, Pokrovsk – Ukraine

Power Utilities

DTEK Power Grid LLC

Kramatorsk, Donetsk Region Ukraine

Pokrovskya Solar Power Plant
Pokrov, Dnipropetrovsk Oblast,
Ukraine
Sustainability
The customer objective was to launch the European-scale project - the 240 MW Pokrovsk solar power plant. The SPP has to generate annually 400 mln kWh of green electricity, which is enough to supply 200,000 private households. In addition, the solar farm aimed to reduce CO2 emissions into the atmosphere by 420,000 tons per year, which is comparable to the emissions generated by more than 200,000 cars.
Siemens Ukraine delivered services on an EPC contract for 35/150 kV power collection substation. The substation collects power generated by Pokrovsk 240 MW solar power plant.  As a general contractor Siemens Ukraine constructed the substation; designed, supplied and installed equipment and finally tested and commissioned the substation. The digital control system was designed and implemented by experts from Siemens Ukraine Engineering Centre.  Supplied and installed equipment included: 
  • 150 kV outdoor switchgear, including circuit breakers, disconnecting switches, instrument transformers, and surge protectors; 
  • four 150/35 kV power transformers, 80 MVA each; 
  • 35 kV, 8DA switchgear; 
  • relay protection and automation.
For DTEK, the Pokrovsk SPP is a quality milestone and a proof of our growing expertise. With the experience we gained with our previous projects we have built a professional team, procured and installed electrical equipment from the best world manufacturers, and ensured the successful integration of the solar power plant into the country's energy system.
said Maksim Timchenko, DTEK CEO
The Pokrovska SPP generates 400 mln kWh of green electricity annually, which is enough to supply 200,000 private households. The solar farm helps reduce CO2 emissions into the atmosphere by 420,000 tons per year, which is comparable to the emissions generated by more than 200,000 cars.
The SPP is located in the Nikopol district on the territory of a former mining quarry (437 hectares). These are non-agricultural reclaimed lands, which will again benefit the country producing clean energy.
Related Links
Please note that some of the links may be only available in Intranet.
Contact
Contact our sales for more information and to discuss directly how our products and solutions could help you to best solve your problem.
Contact Sales
ID: 24707