Minimising any plant down time and reducing maintenance costs.
Siemens Automation, Drives and
Instrumentation
“We use Siemens instrumentation, drives, and automation throughout the plant. This was chosen because it gives precise control of the process, which is exactly what we need.”
Fully integrated fieldbus-based instrumentation and automation system throughout the whole plant.
Precise control, monitoring and optimisation of the whole power generation process.
Quick and easy fault-finding from the control room help minimise any plant down time and reduce maintenance costs.
Global Renewables based in Lancashire, UK, are a waste management and recycling organisation focussed on recycling household waste and environmental education.
They operate an energy-from-waste plant which takes household waste that 1.4 million residents leave at the roadside and uses this to generate upwards of two megawatts of electricity each year.
Related Links
Please note that some of the links may be only available in Intranet.